Monday, November 3, 2008

Mystery solved

So... my hubby is out at the new house this morning, as I type (and talking to someone out there)... and here is what we found out:

* The hole cut in the house was to bring the DRYWALL in, only it wasn't supposed to be there yet and was going to be done neater/differently by this guy, Mark, that Miles is talking to right now.
* The plastic ripped in the bonus room was going to be another entrance point option but obviously when they pulled it all apart, they noticed the wiring, so had to move to plan 'B'. Very interesting.... so I guess only the windows are vandalism and the rest is builder approved! Crazyness - has anyone else seen this done??????????

Sunday, November 2, 2008

Where do I start????

UPDATE: see post above for an explanation - it's apparently not as bad as it originally seemed but we just hadn't heard of them doing this before. A short cut I guess?!

Today, we took a drive out to the new house, so that we could walk around together without all the construction crews being there... we were quite surprised to see that we had been the victims of some ridiculous vandalism. How some people can stoop this low is just beyond comprehension. Why??!! First of all, I noticed a big hole cut in the master bedroom wall, beside the window and insulation was showing. Then Miles told me that the bonus room window had been broken last week because a beer bottle had been thrown at it. Also... because they have taken one of the basement windows out to pour the concrete floor (still not done), it's been sitting outside for close to four weeks and finally got kicked in - I'm not surprised. Then, in the bonus room, someone has taken the vapour barrier and ripped it... at least it's not our problem and sadly enough I'm sure the builders have to deal with this kind of garbage more often that they care to but really people...
On a postive note, we met one of our new neighbours! They have three little girls, a four year old and two-year old twins :)

Basement window smashed

Bonus room window smashed

Vapour barrier ripped *NOTE: we found out the next day that this was the first place they were going to bring the drywall through BUT ran into wiring

Hole in wall from inside, with insulation pulled back...

Hole from the outside... *NOTE: the next day we found out that this was a deliberate work-related 'cut' and used to get the drywall into the house

Last week, they started insulating and also started putting up the soffits and facia. It's looking great but I was a bit concerned that they hadn't put up the two decorative cross pieces in the peaks of the gables yet, so I called the builder and mentioned it. I wasn't sure if they went on before or after the trim and didn't want to be told, "it's too late".... so on October 30th, after picking the kids up from school, I drove by the house to find out that they had put up the cross pieces, only they couldn't be more WRONG! I took a picture of what had been done and then drove by our 'inspiration house' and took a picture of it AND THEN drove straight to the builder and said, "look - this is what you DID... and this is what it is SUPPOSED to be!!!" He got the file and blamed it on being a one dimensional drawing and that there should have been a 3-D picture with it... LOOK IN THE FILE BUDDY! It's been there since about day three!


INSULATION!!!!

The inspiration house... what it should be like!!!


Our house - they put them on the side of the house!?











Thursday, October 16, 2008

Nothing new....

Well our 'possession date' of October 15th has come and gone! Miles did the electrical walk-through on Friday; my new kitchen window arrived yesterday (the original was too high & not at all useful for watching the boys in the yard - the new one is perfect and I'm glad I said something because I kept teetering with 'to accept or not to accept'); and lastly, the electronics guys were there yesterday, roughing in the speakers etc!

Still no basement floor but I'm guessing now that they have to get the furnance going since the temperatures are dropping....... and due to the recent snow and rain, everything is MUD MUD MUD!

Monday, October 6, 2008

Some pics

Updates without pictures just aren't the same (in my opinion anyways), so here's a few I took today, after picking the boys up from school. After yesterdays RAIN the roads were complete MUD and I was sure that I might have to do some 4X4-ing to get outta there. Hubby probably won't be too impressed because we just washed the truck two days ago :)


Main floor fireplace framed in

Bonus room fireplace framed in

Master ensuite

All ready to pour the basement... BUT didn't happen today either?! Hmmm...

"Wrapping' the house with plastic & wire! Whoohoo :)

Saturday, October 4, 2008

What's Up?!?

If you've been wondering what's going on with the house... here's a little update: we were out there today and were pleased to see that both fireplaces were framed in, plumbing and electrical are in progress, bathtubs are in place, the chute is in place (through the basement window) to pour the basement floor... just to name a few! Nothing's changed on the exterior though. The delay is a little frustrating because we are seeing houses that were signed a year after us (and the possession date of months after us) already way past us... they've had their 'electrical walk-through' and the exterior rock work completed. Argh! We're thinking it's because they still have an agent working for them and we are now dealing with the owner, since our 'guy' left for another company...

Saturday, September 13, 2008

Plumbing etc.

On Thursday morning, I met with the plumbing and heating place to go over all our choices and confirm the go ahead. Liam and Cole came with and Liam was very intrigued with all the taps, toilets and tubs... that afternoon when we stopped by the house, we saw that the plumbing has been started!!! It continued to move along on Friday and they are projecting that the basement will be poured by next Wednesday or Thursday!


Liam using his 'perch' to enjoy a snack :)

The shingles are complete!!!

Tuesday, September 9, 2008

{Shingles}

Well it's definitely exciting to see the shingles going on - feels a bit more 'realistic' now! The plumber also called saying that they were ready to start pretty quick but wanted to meet with us first, so we have an appointment there on Thursday morning. Last night I picked out the vanity (Home Depot) that I wanted for the little 1/2 bath on the main floor, instead of a pedestal sink and today I decided on the spindles for the (interior) railing... so the final little details are coming together. We still desperately need to sell our current home though, so it is almost a good thing right now that the new house will be delayed! It's hard not to start feeling a bit anxious about it all!